Stolen The demolition of the concrete mixing station The demolition of the concrete mixing station

, 2015.6.10 16354
  • Colour

    black

  • Frame Number

    12324354356

  • Stolen From

    ,

  • Stolen When

    2015.6.10

  • Crime Reference Number

    41654698

  • Reward

    16354

Bike Description

Concrete mixing station is to sell concrete, due to the concrete dosage is very large twin-shaft concrete mixer, general large mixing station is more, and general merchandise concrete mixing station is two lines. So few. On the contrary the engineering concrete mixing station's main function is to be self-sufficient, only part of the customer will sell part of the amount. Their use accounted for the main. So after the end of a project, there will be a new project in another place, it will be faced with the relocation of concrete mixing station. For concrete mixing station, the various mechanical equipment is indispensable. Of course, there will be a part of the customer when used equipment sold. General concrete mixing station demolition is as follows: Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:cement batch plant,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc.   First, before the demolition of concrete mixing station, need to put all the power, control power off, after the power supply to the mixer, batching machine cement batching plant, screw conveyor and cement storage and other equipment residues of the material to be cleaned twin shaft concrete mixer machine, after washing each line of equipment, and then to power, control power and all control wires are removed. After all the work is completed, the inspection and cleaning of the construction site, the removal of the tools and all the security tools must be done to improve the inspection, see there is no place to forget. To remove the need to use a large crane, cutting machine, wrench, and so on everyday tools. Remove mixing station is not a person to complete the work, so the demolition of the time to more with the manpower.